RG-26E
General-purpose plastic granulator
Cut sprues, runners and production offcuts into regrind for a planned recovery process.
View details for RG-26E General-purpose plastic granulatorRG-36P / RG-46P / RG-56P / RG-76P
A low, extended feeding route for long plastic pipes and profiles, with larger RGP configurations also described for bulky molded scrap.
The RGP pipe and profile ranges use a low feeding route and an extended hopper for long extruded material. Public sources name RG-36P, RG-46P, RG-56P and RG-76P. The pipe-specific feeding arrangement is the first point to compare with a general-purpose hopper.
Use the RGP project checklist to prepare the material and site information for a proposal.
The feed opening, usable material length and cutting chamber are different specification items. Review a drawing for the exact proposed variant before deciding whether long material needs preparation.
Catalogue descriptions include blade and screen access, outboard bearings and hopper-opening arrangements. Confirm whether the quoted hopper opens by a motor-driven or hydraulic mechanism, and provide the space needed for that movement.
The RG-76120P catalogue also names pallets, drums and waste bins as applications to review against this configuration. Supply the actual part dimensions and material for review. If prior reduction is needed, evaluate the shredding stage and the final regrind requirement together.
RGP project checklist (PDF). Download the checklist, fill in the project details and share it with your engineering team or RHONG.
| Item | Details |
|---|---|
| Your material | Polymer and grade; note fillers, reinforcement and contamination. |
| Your section geometry | Longest length, cross-section, wall thickness, ribs and fittings; have photos ready. |
| Your feeding and floor space | How pieces will be supported and presented; approach route and available floor space. |
| Your workload | Scrap per batch or shift, available granulation hours, arrival pattern and material changes. |
| Your regrind requirement | Intended use, required particle size and acceptance criteria for fines or long pieces. |
| Your utilities and collection | Electrical supply and frequency, regrind collection point and dust-handling requirements. |
| RHONG’s proposal | RHONG to confirm the exact variant; feed opening and cutting chamber separately; hopper-opening and service space; included feeding and collection equipment. |
Yes. The RGP catalogue names PVC and PE pipes and profiles among its applications. This does not establish suitability for every grade or incoming condition: the actual section, wall thickness and fittings must be reviewed for the proposed machine.
The published catalogue describes a specially designed cutter holder that draws pipe or profile material entering the hopper into the cutting chamber. This pull-in action is part of the cutter holder’s design. Distinguish this cutter action from any separately supplied upstream feeder in the proposed equipment list.
A cutting chamber dimension is not a feed-opening dimension. To judge whether a whole scrap part suits a plastic granulator, follow its route to the inlet, through the feed path a…
Use the same material, output requirement and operating conditions when comparing machines. Start with the scrap that will actually reach the feed opening.
Send your requirements or questions to RHONG.