Plastic machinery manufacturer
Ningbo, Chinasales@rhongplasticmachinery.com

Selection, documentation and parts inquiries

Send the application details for a new machine, or the model and serial number when you need help with existing equipment.

Wooden shipping crates and packaged equipment in a RHONG warehouse

Discussing a new installation

Describe the task, material and required production rate or batch size. Include operating hours, available space, electrical supply and how the machine connects with the rest of the process.

For scrap recovery, use the granulator selection guide. For resin preparation, the drying guide covers the material and consumption information. The equipment directory lists the other process tasks.

Documents for the proposed machine

Request a specification sheet for the exact model and configuration in the quotation. Review the installation requirements and available operating documents before agreeing the supply.

If you need a particular language, document format or conformity record, name it in the inquiry so its availability and scope can be addressed for that equipment.

When reviewing a conformity document, check the manufacturer, exact model or listed model range, document number and dates. Include any referenced annexes in the review.

Identifying a part or equipment issue

For an existing machine, send the model, serial number and clear photographs. For a component, include its position on the machine and any part reference. For an operating issue, describe what happens and when it occurs.

Use the applicable operating manual for safe use and maintenance. A website inquiry is not an instruction to open a machine or carry out an unverified repair.

Agreeing the service scope

Shipping, commissioning, support availability, warranty and any service costs depend on the quotation and contract. State what your site requires, including any installation or documentation responsibilities, in your inquiry to RHONG.

Before shipment, agree which photographs, operating records and packing details are needed for your order. Identify the machine and configuration in those records.

Check the quotation against your site

  • Exact model, cutting or processing configuration, and included accessories.
  • Electrical supply, available space, and interfaces with existing equipment.
  • Operating documents, required language, and any conformity records to be reviewed.
  • Packing, shipping responsibilities, commissioning and the agreed support scope.

Project checklists

Prepare material and site details and review the proposed equipment scope with the RGP pipe and profile project checklist and the pellet loading project checklist.

Need help selecting equipment?

Send your requirements or questions to RHONG.